AES-A1035W
Product parameter
- Power:11.2kW
- Heating power:4kW
- Cooling Water Quantity AT 25℃: 3.6m3/h
- Temperature control accuracy:±1℃
WhatsApp: +86 17851209193
Search all
Detailed Description
Model | AES-A1035W | |||||
Temp. Range | -100℃~225℃ | |||||
Heating Power | 4.5kW | |||||
Refrigerating Output | -100℃ | 1.2kW | ||||
Temp. Control Accuracy | ±1℃ | |||||
Temp. Conversion Time | -70℃ to 150℃ Approximately 10S 150 ℃to -70℃ Approximately 20s |
|||||
Air Requirement | Air Cleaner<5um | |||||
Air Oil Content:<0.1ppm | ||||||
Air Temp&Humidity:5℃~32℃ 0~50%RH | ||||||
Air Handing Capacity | 7m3/h ~ 25m3/h Pressure 5bar~7.6bar | |||||
System Pressure Dispiay | Pressure of Refrigeration system is realized by pressure gauge (High pressure, low pressure); | |||||
Pressure of circulatory system is detected by pressure sensor and displayed on touch screen. | ||||||
Controller | Siemens PLC, Fuzzy PID Control algorithm. | |||||
Temp. Control | Control of outlet temperature | |||||
Programmable | 10 procedures can be developed, and each program can be composed of 10 steps | |||||
Communicating Protocol | Ethernet Interface TCP/IP Protocol. | |||||
Internal Temp. Feedback | Equipment outlet temperature, refrigeration system condensation temperature, ambient temperature, compressor suction temperature, cooling water temperature (water cooling equipment is configured) . | |||||
Temp. Feedback | T Temperature Sensor | |||||
Compression Engine | Italy Duling | |||||
Evaporimeter | Double-pipe (heat) Exchanger | |||||
Calorifier | Flanged Barrel Heater | |||||
Refrigeration Accessory | Danfoss / Emerson fittings (dry filters, oil separators, high and low pressure protectors, expansion valves, solenoid valves). | |||||
Operation Panel | LNEYA custom 7-inch color touch screen, temperature curve display\ EXCEL data export. | |||||
Safe Guarding | With self-diagnosis function; phase sequence phase breaker, freezer overload protection; high-voltage pressure switch, overload relay, thermal protection device and other safety protection functions. | |||||
Cryogen | Topsubmixed Refrigerant | |||||
External Insulation Hose | 8m DN32 fast coupling clamp for easy outgoing insulation hose | |||||
Shape Dimension (Wind)cm | 80*120*185 | |||||
Shape Size (Water)cm | 70*100*175 | |||||
Air-Cooled Type | Copper tube aluminum fin condensation mode, upper and out type, condensing fan using Germany EBM axial flow fan. | |||||
Water-Cooled Type W | Type W is water cooled | |||||
Water-Cooled Condenser | Sleeve type heat exchanger (Paris/ Shen’s) | |||||
Cooling Water Quantity At 25℃ | 2.6m3/h | |||||
Source 380V 50HZ | 6.8kW max | |||||
Source | Customizable 460V 60HZN 220V 60HZ three-phase | |||||
Shell Material | Cold rolled sheet spray (Standard Colour 7035). | |||||
Temp. Spread | High Temperature To +300℃ |
LNEYA attends various exhibitions at home and abroad every year. At the exhibition, we show the latest research equipment of LNEYA. Every year, long-term cooperative customers will come to exhibitions and communicate with us. We are also actively developing new customers to provide them with high quality machines and services.
Guarantee that the goods are sold to be conform to the provisions of the contract and qualified new products by factory inspection, quality performance, technical indicators and configured are in accordance with manufactures and technical documents stipulated in the contract.
After the arrival of the goods, my company or my company agent is responsible for installation and debugging of equipment need on-site installation and debugging.
After installation and debugging, acceptance by the customer to confirm the goods to be conform to the provisions of the contract and qualified new products, quality performance, technical indicators and configured are in accordance with manufactures and technical documents stipulated in the contract, and after the confirmation of a full set of technical documents, sign the installation acceptance report and confirm acceptance.
At the same time of installation and debugging of equipment, my company’s after-sales service engineer is responsible for technical training for user until user can be skilled of operation. In the process of using equipment by customer, customer can consult relevant technical issues to after-sales service personal of our company at any time, according to the situation, my company will arrange training on site or remote.
A full free one year warranty since the date of acceptance, during the warranty period, all repairs and spare parts are free of charge(instrukent malfunction caused bu human factors will be charged of cost price of spare parts); After the warranty period, we will be responsible for maintenance of equipment for lifetime, according to the actual maintenance fees, appropriate fee will be charged.
(PS:There will have extra charge if the customer need on-site service. And customers need to describe the issue first and then send some failed pics or videos in advance, then Lneya judge if it is possible to go for after-Sales on site. )