Search Search all

ZLF-125N / ZLF-125NS / ZLF-125NH / ZLF-125NSH

Product parameter

  • Power:8kW or 73kW(with H)
  • Heating power:65kW(with H)
  • Flow:500L/min
  • Pressure:2.5bar
  • Temperature control accuracy:±1℃

All products support customized services

 

Request a Quote       Email Us        More Product Models

LNEYA-TCU temperature control system can realize -120°C to 300°C of dynamic temperature control, using existing thermal energy (such as steam, cooling water and ultra-low temperature liquid – that is, “primary system”) infrastructure integration for control Process equipment temperature in a single fluid system or secondary circuit. This completes the flow of only one heat transfer liquid into the jacket of the reaction vessel (rather than directly into the steam, cooling water or cryogenic liquid). The entire reaction process temperature is controlled by calculation.

Product Description

Excellent performance, high precision, intelligent temperature control, very wide temperature control range, from -120 °C ~ 350 °C, suitable for most enterprises temperature control needs. Product temperature control accuracy of ± 0.5 ° C, cooling power from 0.5 kW to 1200 kW can provide the corresponding products.

Temperature Process Control Principle (Control Reaction Kettle Material Temperature)

Temperature Process Control Principle

Through three-point sampling (material temperature point, temperature control system outlet temperature, temperature control system inlet temperature), and our own model-free self-built tree algorithm and general anti-lag cascade algorithm, solve the problem of large delay in pharmaceutical chemical temperature control .

Product Parameters (All products can be customized)

ModelZLF-125N
ZLF-125NS
ZLF-125NH
ZLF-125NSH
Temp. range ℃-45~ 250degree (setting the max temp according to the supplier heating or cooling source)
-40~135degree(The maximum temperature range can be operated by using glycol water formula.)
ZLF-  NThe main cold source/or main heat source is used to regulate the flow of the system through proportional regulation system, and control the heat of the clamping of the reaction tank, and a set of heat exchanger for heating or cooling is controlled or cooled.
ZLF-  NSBesides ZLF- N function,add one set heater used to reduce high temp.
ZLF-  NHBesides ZLF- N function,add electrical heating function
ZLF-  NSHBesides ZLF- N function,add one set heater used to reduce high temp and electrical heating function
Heat exchanger area12.5m2
Electric heating function H65KW
With “H” has heating function
Control modeFeed forward PID + Our special dynamic control calculation,LNEYA PLC controller
Communication protocolMODBUS RTU protocol,RS485 interface,optional Ethernet interface/R232 interface
Temp control selectionProcess temp control
Temperature feedbackThe temperature of three points: the inlet and outlet of heat-conducting medium, material in reactor(External temperature sensor), PT100 sensor
Process temp. feedbackRaw material process feedback:PT100 or 4~20mA or communication given
Temp. feedback:PT100
temp feedback: normal PT100
Temperature accuracy±1℃
Circulation pump500L/min 2.5BAR
Input and display7-inch color touch screen,temperature graph display
Safety protectionSelf-diagnosis function;freezer overload protection;high pressure switch;overload relay;thermal protection device;liquid low level protection;high temp. Protection and temp. fault protection.
Perform valve pieceElectric proportional control valve, control signal 4~20mA.
Piping materialSUS304
Connection sizeDN-65
Dimension mm2050*1450*2050
Dimension EX mm2050*1450*2050
Power
AC380V50HZ
5.7kw(max)
With H power
AC380V 50HZ
70.7kw(max)
Case materialSUS 304

About Us

Classified Information

Categories: ,

Detailed parameters

Max Working Temp.

250℃

Min Working Temp.

-45℃

Power

5~10kW

Temp. control mode

Thermal Oil Temp. Control, Reaction Material Temp. Control

Temp. Accuracies

±1℃

LNEYA attends various exhibitions at home and abroad every year. At the exhibition, we show the latest research equipment of LNEYA. Every year, long-term cooperative customers will come to exhibitions and communicate with us. We are also actively developing new customers to provide them with high quality machines and services.

After sale service

Quality assurance

Guarantee that the goods are sold to be conform to the provisions of the contract and qualified new products by factory inspection, quality performance, technical indicators and configured are in accordance with manufactures and technical documents stipulated in the contract.

Installation and debugging

After the arrival of the goods, my company or my company agent is responsible for installation and debugging of equipment need on-site installation and debugging.

Inspection and acceptance

After installation and debugging, acceptance by the customer to confirm the goods to be conform to the provisions of the contract and qualified new products, quality performance, technical indicators and configured are in accordance with manufactures and technical documents stipulated in the contract, and after the confirmation of a full set of technical documents, sign the installation acceptance report and confirm acceptance.

Training

At the same time of installation and debugging of equipment, my company’s after-sales service engineer is responsible for technical training for user until user can be skilled of operation. In the process of using equipment by customer, customer can consult relevant technical issues to after-sales service personal of our company at any time, according to the situation, my company will arrange training on site or remote.

After sale service commitment

A full free one year warranty since the date of acceptance, during the warranty period, all repairs and spare parts are free of charge(instrukent malfunction caused bu human factors will be charged of cost price of spare parts); After the warranty period, we will be responsible for maintenance of equipment for lifetime, according to the actual maintenance fees, appropriate fee will be charged.

(PS:There will have extra charge if the customer need on-site service. And customers need to describe the issue first and then send some failed pics or videos in advance, then Lneya judge if it is possible to go for after-Sales on site. )

Get Free Quote Plan

loading...

购物车

X

我的足迹

X
keywords:< a href="https://lneya-online.com/sitemap.html" title="water chiller"target="_blank">Bottled joy < a href="https://lneya-online.com/sitemap.xml" title="water chiller"target="_blank">water chiller